top of page
Call: +90 532 209 76 45

Tat Golf Club 1997 - 2001

I took an active role in the final construction phases and opening process of the 27-hole championship course.
• After the rough leveling of the field, final leveling operations are carried out.
• Application of Bermuda 419 (fairway) and Tifgreen 328 (green) grass types in rolls and seedling form
• Installation of a 400 m³/hour capacity multi-stage pump station and the establishment of a synchronized TORO irrigation system infrastructure.
• Shaping of greens, tees, fairways and rough areas in accordance with the architectural plan
• Installation of surface drainage and underground drainage systems depending on land slopes
• Establishing and implementing annual overseeding and summer maintenance programs

tat_golf_03.jpg

Contact Form

7fd42e5a-0852-49dd-a02f-fcb8a0f9ae4d.JPEG

Ahmet ÇAĞIL

Lawn Expert

Do you want to get a quote for your project, request technical support or get detailed information?
You can reach us anytime via the contact form or our social media channels!

  • Instagram
  • LinkedIn
What can we help with?
bottom of page